Rizvis Global Operations ยท Malaysia
๐Ÿ—๏ธ Verified Engineering Case Studies (Malaysia)

Delivered With Precision, Handed Over On Time.

Explore our verified mechanical, electrical, commercial fit-outs, certified skylift high-access, and heavy roller compaction engagements across Selangor and Greater Kuala Lumpur.

๐Ÿ’ก Looking for a trusted contracting partner in Malaysia with CIDB compliance and guaranteed SLA execution?
Request Project Consultation โž”
Proven Field Track Record

Selected Enterprise Engagements

Every engagement is managed under our proprietary SOF-XI Cloud Enterprise platform with live milestone tracking, ISO 9001 quality audits, and transparent client reporting.

Corporate HQ MEP Overhaul
MEP & Renovation 45,000 sq. ft.

Corporate HQ Electrical & Fit-Out Modernization

Turnkey overhaul including 3-phase main distribution board (MDB) engineering, tempered glass executive offices, acoustic ceilings, and smart energy-efficient automated LED lighting circuits.

โœ“ Handed Over in 6 Weeks Inquire Scope โž”
Logistics Warehouse Skylift High-Bay
Skylift Boom Rental 45ft Telescopic Access

Logistics Warehouse High-Bay Lighting Replacement

Deployment of dual 45ft boom truck skylifts with licensed operators for 120+ high-bay fixture retrofits, roof cable containment inspection, and high-level ventilation fan balancing.

โœ“ Zero Lost-Time Incidents Rent Skylift โž”
Heavy Road Roller Compaction
Civil & Roller Fleet Heavy Compactor

Industrial Yard Sub-Base Compaction & Asphalt

Tandem vibratory roller and single-drum soil compactor mobilization for a 12,000 sqft heavy-load logistics driveway, sub-base laser grading, and dense wear-resistant asphalt paving.

โœ“ 98% Proctor Density Met Hire Fleet โž”
Commercial Aircond Overhaul
HVAC Overhaul 28 Cassette Units

Commercial Center 28-Unit Aircond Chemical Wash

Scheduled weekend chemical coil sterilization, blower wheel extraction, drainage descaling, and R410A refrigerant recharge across a multi-floor banking center without tenant downtime.

โœ“ 40% Cooling Delta Boost Book Overhaul โž”
Server Room IT Cabling
IT Infrastructure 42U Server Rack

42U Server Rack & 120-Point Cat6 Cabling

Structured network containment, patch panel terminations, Cisco PoE switch stack deployment, offline UPS redundancy integration, and corporate workstation provisioning.

โœ“ Fluke DTX-1800 Passed IT Store โž”
๐Ÿ“‘
Commercial Tender & BOQ Submission

Let Us Quote Your Project

Send us your architectural drawings, tender BOQ, or maintenance scope. Our certified engineering estimators provide transparent, itemized bids within 24 hours.

Submit Project Brief โž”
Skyline
Track Record In Numbers
0
Sq. Ft. Managed & Handed Over
0
Commercial & Industrial Facilities
0
First-Time Fix SLA Reliability
0
Rapid MEP Emergency Dispatch